Skip to content

Releasing SibillaOS

The release is not done at the tag. This is the whole procedure, in order, because the post-tag half is the half that gets forgotten.

Before the PR

  1. The cycle's roadmap section flips to (released) with a one-line summary and a link to docs/releases/vX.Y.0.md, which exists and follows the structure of the previous notes. A stub section for the next cycle carries everything that survives.
  2. The catalog, if it changed this cycle, verifies in the clone: gpg --verify catalog/models.json.asc catalog/models.json says Good with the date of the cycle's re-sign, and the digest count is what the cycle left (jq '[.models[].digests // {} | length] | add').

The PR and the tag

  1. Squash PR from release/X.Y to main, title release: SibillaOS X.Y.0 - <the cycle's name>. Merge on green.
  2. git checkout main && git pull && git tag vX.Y.0 && git push origin vX.Y.0.
  3. Wait for the TAG run to go fully green. Tag runs carry the real version into the debs and the demo; branch runs carry a fallback version, which is why nothing below may use a branch-run artifact.

After the tag - the forgettable half

  1. GitHub Release: draft on tag vX.Y.0, body = the full content of docs/releases/vX.Y.0.md, attach the tag run's artifacts: SHA256SUMS, SHA256SUMS-cloud-amd64, SHA256SUMS-cloud-arm64, both SBOMs, installed-packages.tsv, the ISO .part files and the cloud qcow2 parts. The previous release shows the expected set (14 assets).
  2. The demo: download the TAG run's terminal-demo artifact, then verify before swapping - grep -c "X.Y.0" demo.svg above zero, grep -c "0.2.0" demo.svg exactly zero (0.2.0 is the dev fallback version; seeing it means a branch-run artifact) - and commit it as branding/demo-quickstart.svg directly on main.
  3. Confirm the apt repository answers with the new version: the upgrade-test job on the next push proves it end to end, and https://engineering87.github.io/sibillaos/apt/InRelease answering is the quick manual check.
  4. Only now branch release/X.Y+1 from the updated main. A branch cut before the merge is missing the whole previous cycle and must be deleted and recut, not rebased by hand.

Announcing

  1. The distribution pack for the release references files on main: publish only after the tag, and only when there is time to answer comments in the first hours.